« Back to News & Notices

DLQOR-Failure to submit

Notice of Failure to Submit a Disinfectant Level Quarterly Operating Report (DLQOR)

MONITORING, ROUTINE (DBP), MAJOR/CHLORINE

 

Barton Water Supply Corporation (PWS ID 0720013) has violated the monitoring and    reporting requirements set by Texas Commission on Environmental Quality (TCEQ) in Title 30,  Texas Administrative Code (30 TAC), Section 290, Subchapter F.  Public water systems are required to properly disinfect water before distribution, maintain acceptable disinfection residuals within the distribution system, monitor the disinfectant residual at various locations throughout the distribution system, and report the results of that monitoring to the TCEQ on a quarterly basis.

Results of regular monitoring are in indicator of whether or not your drinking water is safe from microbial contamination.

This violation occurred in the monitoring period:  4th Quarter of 2016 – October, November, December

 

We are taking the following actions to address this issue:

The quarterly report has been sent to TCEQ.

Please share this information with all people who drink this water, especially those who may not have received this notice directly (i.e., people in apartments, nursing homes, schools, and businesses). You can do this by posting this notice in a public place or distributing copies by hand or mail.

If you have questions regarding this matter, you may contact Josh Nolte at (254) 693-5258.